Showing posts with label Bostonian. Show all posts
Showing posts with label Bostonian. Show all posts

Thursday, February 7, 2013

BOSTONIAN PROGRESS

This house will probably take much longer than my typical 12 years. All the doors and windows come in a million parts that have to be assembled. Then of course is all the sanding and several coats of paint.
I was not happy with the doors that came in the kit, so I purchased new ones (already assembled), and I  added a porthole window. I also changed up the floor plans a bit by adding a 1/2 bath on the first floor, and a full bath on the third floor. 
I drilled a hole in the ceiling under the tower, to enable more light to come in.
Readying for shingles